Goods Lift installed at One Stop Store Oldbury West Midlands

Goods Lift installed One Stop Store Oldbury West Midlands
Goods Lift, installed at One Stop Store Stanley Road, Oldbury West Midlands Goods Lift, installed at One Stop Store Oldbury West Midlands Goods Lift, installed at One Stop Store Stanley Road, Oldbury West Midlands Goods Lift, installed at One Stop Store Stanley Road, Oldbury West Midlands Goods Lift, installed at One Stop Store Stanley Road West Midlands Goods Lift, installed in Oldbury West Midlands Goods Lift, installed in Oldbury lightbox MACby VisualLightBox.com v6.1

Goods Lift installed One Stop Store Oldbury West Midlands

  • Construction of the pit is the responsibility of the client/customer.  The pit should be in accordance with drawings to be supplied by MHS and should be of proper materials and level.
  • 3 phase and earth mains electrical supply must be wired to an isolator no further than 3Ms from the location of the installation.
  • This will be required throughout the installation and for the operation of the lift along with 1 phase, 220 Volts for installation power tools.  Customer is responsible for ensuring that electrical output supply complies with current I.E.E. Regulations.
  • The delivery vehicle and our installers require free and unobstructed access to the site and area of installation at all times throughout the installation period.  There are to be no restrictions to work being able to carry on uninterrupted.
 

Goods Lift installed One Stop Store Oldbury West Midlands